Watch
Measure total facility demand and compare it with the configured target.
Demand charges can be driven by the highest short interval of facility use. DAC Systems coordinates eligible loads to help reduce those peaks without treating every piece of equipment the same.
Historical and reported results are not guarantees. Savings and eligibility vary by utility tariff, interval demand, equipment, operations, site conditions, and installation design.
Get answers or leave your name, callback number, and reason for reaching out.
Text DAC Systems at (844) 569-5446. By texting this number, you agree to receive SMS text messages from DAC Systems in reply to your inquiry. Message frequency varies. Message and data rates may apply. Reply STOP to opt out, HELP for help. Full messaging terms.
kWh measures energy used over time. kW measures the rate of use at a moment or interval. Many commercial tariffs use the highest measured interval to calculate a demand charge. Your tariff and interval data must be verified.
Measure total facility demand and compare it with the configured target.
Identify short periods when eligible loads are stacking and prioritize what can wait.
Temporarily sequence eligible loads while preserving the operating rules established for the site.
Historical and reported results are not guarantees. Savings and eligibility vary by utility tariff, interval demand, equipment, operations, site conditions, and installation design.
Multiple cooling and building loads overlapped during peak periods.
Historical reported result: a meaningful reduction in billed demand after load sequencing.HVAC, water heating, and other large loads created short demand spikes.
Historical reported result: lower peak demand while essential operations remained prioritized.The operator needed a coordinated view of deferrable electrical loads.
Historical reported result: improved demand control across the operating schedule.Choose Not sure when needed. You will receive a preliminary result after the request is safely stored.
A specialist reviews your tariff, bills, interval data when available, equipment, and operating needs.
Generally scheduled about one week after contract and payment, subject to site and electrician availability.
Completion is typically expected within four to six weeks. Necessary shutdowns are coordinated, with after-hours work when available.
The installed system does not require a recurring monitoring, maintenance, subscription, or service contract from DAC Systems.
The primary purpose is to reduce costly demand peaks by coordinating when eligible loads operate. Total energy use and billing outcomes depend on the utility tariff and site.
Eligible loads may be deferred for short periods according to the approved site design. Essential loads and operating rules are reviewed before installation.
Recent utility bills, up to 12 months when available, plus photos of panels, HVAC, water heating, refrigeration, and equipment nameplates can make the review more useful.
No. It is a preliminary screening based only on supplied answers. A specialist must verify the tariff, interval demand, equipment, electrical system, and site conditions.
DAC Systems does not require a recurring monitoring, maintenance, subscription, or service contract for the installed system.
No online result is a rejection or engineering approval. A specialist verifies the next step.
Check my business